The North Sarah project was a residential development located between Midtown and Central West End, not far from St. Louis University. Kelpe’s role was the installation of sewer and water main. The challenge of this project was the storm sewer connection to the Old Mill Creek sewer tunnel, located about 100′ below the surface. To
Read More